Skip to content
  • There are no suggestions because the search field is empty.

Updating multiple tickets at once on the drawing

After a walkround, a drawing is often covered in tickets that all need the same label, status or Responsible. You no longer have to open them one by one. On the drawing, you select a whole group of tickets in one go and update them together, so you're done sooner after your walkround.

This feature works in the web app, on drawings and on the geographic map.

Please note: this feature is only available for specific roles and licences.

Available for: Start (Tickets), Pro, Expert
Applies to the roles: Accountable and Support

Selecting tickets on the drawing

  1. Log in to web.edcontrols.com and open the project.
  2. Open the drawing with the tickets you want to update.
  3. Click Select in the drawing toolbar. While you are selecting, clicking on the drawing won't create a new ticket.
  4. Hold down Ctrl (Windows) or Cmd (Mac) and drag a box around the tickets. All tickets inside the box are now selected, including tickets that are grouped together on the drawing.
  5. To add a ticket to your selection or remove one from it, hold down Ctrl or Cmd and click that ticket. The rest of your selection stays as it is.

Selected tickets have a highlighted border, so you can see straight away which ones are included.

Updating the selected tickets

At the top you can see how many tickets you've selected and what you can do with them. These are the same actions as in the ticket list: add or remove labels, change the status or assign a Responsible. Choose an action and confirm it, and it's applied to all selected tickets at once. Just like in the ticket list, you can undo an action afterwards.

Click an empty spot on the drawing or turn off Select, and your selection is cleared. The drawing then works as usual again: you pan, zoom and open a ticket with a click.

See also: Editing multiple tickets/audits at once

See also: What roles and rights are available in Ed Controls?